Conceptual design is probably the most important thing in design, a free exercise in pure creativity to shape the project you have in mind. It is ideal if you want to know what the project would be like but do not expect to build soon or if you need it to find funds to finance the work. We do not recommend it for construction as it lacks technical details and necessary development for a future staging.

INCLUDES:
Preparation of a preliminary project, submitting it to the owners’ approval.
Preparation of general plans, plans, sections and elevations.
3D images of the proposal.

EXCLUDES:
Everything that is not indicated in inclusions.
Plans suitable for construction.

In the interior design and finishing project we work on the interior design, to have each space custom designed. The specific architecture floors, coatings and etc. While at this stage we design custom furniture, kitchen and closets, as well as the choice of interior coverings, taps, handles, etc.

INCLUDES :
Preparation of detailed plans and complete coatings for construction.
Kitchen plans, closet and other furniture on site.
Choice of lighting, artifacts, hardware, paintings, protectors and doors.
Coating specifications and their quotes.
Departure with suppliers to choose finishes.
Technical specifications and plans complementary to architecture.

EXCLUDES :
All work related to the construction administration and the Technical Inspection itself.
Materials cubing.
Decoration, purchase or choice of furniture that is not on site.

USD*ft2

Conceptual design is probably the most important thing in design, a free exercise of pure creativity to shape the project you have in mind. It is ideal if you want to know what the project would be like but do not expect to build soon or if you need it to find funds to finance the work. We do not recommend it for construction as it lacks technical details and necessary development for future staging.

INCLUDES:
Preparation of a preliminary draft, submitting it for approval of the owners.
Preparation of general plans, plans, sections and elevations.
3D images of the proposal.

EXCLUDES:
Everything that is not indicated in inclusions.
Plans suitable for construction.

The architecture project is the continuation of the conceptual design, it is necessary for construction because details, technical specifications are developed and different specialties are coordinated to have a folder of plans suitable for construction and thus Do not improvise on site, which has a very high cost.

(*) Preliminary draft (conceptual design) is needed for this service.

INCLUDES :
Preparation of detailed plans suitable for construction.
Preparation of electrical points plan. (Does not include electrical or lighting project).
Door and window plans.
Preparation of Technical Architecture Specifications.

EXCLUDE :
Choice of specific finishes.
Budgeting.
Material measurements.
Printed copies of plans for other professionals and specialists.

In the interior design and finishing project we work on the interior design, to have each space custom designed. The specific architecture floors, coatings and etc. While at this stage we design custom furniture, kitchen and closets, as well as the choice of interior coatings, taps, handles, etc.

INCLUDES :
Preparation of detailed plans and complete coatings for construction.
Kitchen plans, closet and other furniture on site.
Choice of lighting, appliances, hardware, paintings, protectors and doors.
Specifications of coatings and their quotes.
Exit with suppliers to choose finishes.
Technical specifications and complementary architectural plans.

EXCLUDE :
All work related to the administration of the construction and the technical Inspection itself.
Measurement of materials.
Decoration, purchase or choice of furniture that is not on site.

The Municipal Folder for the building permit that gives the direction of works in the municipality is a legal document that allows you to build, it is necessary for land within the city or if you want to apply for a mortgage loan with the bank, later the final reception of the work is made (which is the famous regularization but at the appropriate time) and with that the project becomes registered.

INCLUDES :
Preparation of antecedents for work permit files (Includes municipal processing of permits and reception, but payment of fees is excluded).
Preparation of reception files, (payment of fees is excluded). < br /> The processing of the building permit is valid for 2 years.

EXCLUDES :
Payment of taxes and duties, permits that due to the project are must pay public utility companies.
Transfer costs if it does not coincide with a visa Ita to land included.
Modifications made to the project, after the approved permit, are not included in the final cost.

USD*ft2

Conceptual design is probably the most important thing in design, a free exercise of pure creativity to shape the project you have in mind. It is ideal if you want to know what the project would be like but do not expect to build soon or if you need it to find funds to finance the work. We do not recommend it for construction as it lacks technical details and necessary development for future staging.

INCLUDES:
Preparation of a preliminary draft, submitting it for approval of the owners.
Preparation of general plans, plans, sections and elevations.
3D images of the proposal.

EXCLUDES:
Everything that is not indicated in inclusions.
Plans suitable for construction.

The architecture project is the continuation of the conceptual design, it is necessary for construction because details, technical specifications are developed and different specialties are coordinated to have a folder of plans suitable for construction and thus Do not improvise on site, which has a very high cost.

(*) Preliminary draft (conceptual design) is needed for this service.

INCLUDES :
Preparation of detailed plans suitable for construction.
Preparation of electrical points plan. (Does not include electrical or lighting project).
Door and window plans.
Preparation of Technical Architecture Specifications.

EXCLUDE :
Choice of specific finishes.
Budgeting.
Material measurements.
Printed copies of plans for other professionals and specialists.

In the interior design and finishing project we work on the interior design, to have each space custom designed. The specific architecture floors, coatings and etc. While at this stage we design custom furniture, kitchen and closets, as well as the choice of interior coatings, taps, handles, etc.

INCLUDES :
Preparation of detailed plans and complete coatings for construction.
Kitchen plans, closet and other furniture on site.
Choice of lighting, appliances, hardware, paintings, protectors and doors.
Specifications of coatings and their quotes.
Exit with suppliers to choose finishes.
Technical specifications and complementary architectural plans.

EXCLUDE :
All work related to the administration of the construction and the technical Inspection itself.
Measurement of materials.
Decoration, purchase or choice of furniture that is not on site.

The Municipal Folder for the building permit that gives the direction of works in the municipality is a legal document that allows you to build, it is necessary for land within the city or if you want to apply for a mortgage loan with the bank, later the final reception of the work is made (which is the famous regularization but at the appropriate time) and with that the project becomes registered.

INCLUDES :
Preparation of antecedents for work permit files (Includes municipal processing of permits and reception, but payment of fees is excluded).
Preparation of reception files, (payment of fees is excluded). < br /> The processing of the building permit is valid for 2 years.

EXCLUDES :
Payment of taxes and duties, permits that due to the project are must pay public utility companies.
Transfer costs if it does not coincide with a visa Ita to land included.
Modifications made to the project, after the approved permit, are not included in the final cost.

The sanitary or sewage and drinking water project is in charge of solving the pipes and ducts to ensure the correct operation of the project, it is important to calculate the diameters to ensure good pressure.

INCLUDES:
Sewerage project development and absorbent well sizing.
Development of needs study for rainwater system if applicable.
Advice in the bidding stage to answer the question of proposers.

EXCLUDES:
Visits during construction.
Preparation of the Porchet test to determine the infiltration rate of the land.
Payment of the fee for admission to review in the health seremi.
Approval before Seremi Salud of the informative project.

In the architecture project, positions of plugs and lights are defined, in the electrical project loads, cables, distribution boards, etc. are defined.
We are in a time when almost everything uses energy, you have to think about the future when designing the project.


INCLUDES:
Electrical system design for new power take-offs.
Feeder design.
Design of unilinear diagrams of electrical panels corresponding to intervened areas and their respective load panels.
Advice in the bidding stage to answer questions from bidders.

EXCLUDES:
Approval before authorities.
T1 report for the final reception of the work (responsibility of the constructor).
Field visits.
Materials cubing.
Budgeting.

The structural calculation project is to design the skeleton, over 140 m2 and especially for a seismic country it is necessary to trust an engineer to optimize the efforts to which the materials are subjected. A good reason for doing the calculation project is that optimizations are generated in terms of materials to lower costs later in construction.

USD*ft2

Conceptual design is probably the most important thing in design, a free exercise of pure creativity to shape the project you have in mind. It is ideal if you want to know what the project would be like but do not expect to build soon or if you need it to find funds to finance the work. We do not recommend it for construction as it lacks technical details and necessary development for future staging.

INCLUDES:
Preparation of a preliminary draft, submitting it for approval of the owners.
Preparation of general plans, plans, sections and elevations.
3D images of the proposal.

EXCLUDES:
Everything that is not indicated in inclusions.
Plans suitable for construction.

The architecture project is the continuation of the conceptual design, it is necessary for construction because details, technical specifications are developed and different specialties are coordinated to have a folder of plans suitable for construction and thus Do not improvise on site, which has a very high cost.

(*) Preliminary draft (conceptual design) is needed for this service.

INCLUDES :
Preparation of detailed plans suitable for construction.
Preparation of electrical points plan. (Does not include electrical or lighting project).
Door and window plans.
Preparation of Technical Architecture Specifications.

EXCLUDE :
Choice of specific finishes.
Budgeting.
Material measurements.
Printed copies of plans for other professionals and specialists.

In the interior design and finishing project we work on the interior design, to have each space custom designed. The specific architecture floors, coatings and etc. While at this stage we design custom furniture, kitchen and closets, as well as the choice of interior coatings, taps, handles, etc.

INCLUDES :
Preparation of detailed plans and complete coatings for construction.
Kitchen plans, closet and other furniture on site.
Choice of lighting, appliances, hardware, paintings, protectors and doors.
Specifications of coatings and their quotes.
Exit with suppliers to choose finishes.
Technical specifications and complementary architectural plans.

EXCLUDE :
All work related to the administration of the construction and the technical Inspection itself.
Measurement of materials.
Decoration, purchase or choice of furniture that is not on site.

The Municipal Folder for the building permit that gives the direction of works in the municipality is a legal document that allows you to build, it is necessary for land within the city or if you want to apply for a mortgage loan with the bank, later the final reception of the work is made (which is the famous regularization but at the appropriate time) and with that the project becomes registered.

INCLUDES :
Preparation of antecedents for work permit files (Includes municipal processing of permits and reception, but payment of fees is excluded).
Preparation of reception files, (payment of fees is excluded). < br /> The processing of the building permit is valid for 2 years.

EXCLUDES :
Payment of taxes and duties, permits that due to the project are must pay public utility companies.
Transfer costs if it does not coincide with a visa Ita to land included.
Modifications made to the project, after the approved permit, are not included in the final cost.

The sanitary or sewage and drinking water project is in charge of solving the pipes and ducts to ensure the correct operation of the project, it is important to calculate the diameters to ensure good pressure.

INCLUDES:
Sewerage project development and absorbent well sizing.
Development of needs study for rainwater system if applicable.
Advice in the bidding stage to answer the question of proposers.

EXCLUDES:
Visits during construction.
Preparation of the Porchet test to determine the infiltration rate of the land.
Payment of the fee for admission to review in the health seremi.
Approval before Seremi Salud of the informative project.

In the architecture project, positions of plugs and lights are defined, in the electrical project loads, cables, distribution boards, etc. are defined.
We are in a time when almost everything uses energy, you have to think about the future when designing the project.


INCLUDES:
Electrical system design for new power take-offs.
Feeder design.
Design of unilinear diagrams of electrical panels corresponding to intervened areas and their respective load panels.
Advice in the bidding stage to answer questions from bidders.

EXCLUDES:
Approval before authorities.
T1 report for the final reception of the work (responsibility of the constructor).
Field visits.
Materials cubing.
Budgeting.

The structural calculation project is to design the skeleton, over 140 m2 and especially for a seismic country it is necessary to trust an engineer to optimize the efforts to which the materials are subjected. A good reason for doing the calculation project is that optimizations are generated in terms of materials to lower costs later in construction.

INCLUDES:
Compilation of the background. Presentation of concepts: reference images, layout drawings, photomontages, suggested equipment images. Planimetries: (.dwg and .pdf formats) Technical sheets (.pdf format) with EETT Lighting (lighting detail) Cubication and Total loads (.pdf format and in itemized lighting planimetries Calculation memory, through dialux evo software, of Project type areas, expected levels of illuminance, three-dimensional vision of how the lighting proposal will be visualized Coordination meetings and field visits will be considered, after coordination to review the lighting project in Santiago.

EXCLUDES:
Visits to work outside Stgo. (They will be charged to the client and charged as extras according to the fee letter delivered to Winteri) BIM Modeling Installation of Luminaires. Purchase of Luminaires (We can access good prices, but the purchase is direct with the supplier.

STARTER SIMULATION

CONSTRUCTION MONITORING

USD/Uni.
5,00

TOTAL USD

TOTAL EUR

TOTAL UF

SIMULACIÓN CLP

SIMULATION ARCHITECTURE

CONSTRUCTION MONITORING

USD/Uni.
5,00

TOTAL USD

TOTAL UF

SIMULACIÓN CLP

TOTAL EUR

SIMULATION MEDIUM

CONSTRUCTION MONITORING

USD/Uni.
5,00

TOTAL USD

TOTAL UF

SIMULACIÓN CLP

TOTAL EUR

SIMULATION WINTERI FULL

CONSTRUCTION MONITORING

USD/Uni.
5,00

TOTAL USD

TOTAL UF

SIMULACIÓN CLP

TOTAL EUR

(*) Each project includes 5 construction monitoring, which add up to 25 UF total (already contemplated). (*) Transportation, accommodation and per diem expenses are not included in the budget.